starting the finishes…

It’s something (scary?) to see the drawings jump off the paper and into real life: the entry stair gets the gridded walls we laid out.
The rooms are coming together and some early finishes are being installed, like tile and stone.

Chicken wire!  And pavers from American Slate.  (there’s radiant heat below, so it won’t freeze the feet..)

Bathroom floor marble tile (upper) and glass wall tile (lower).

Below: when the old brick fireplace was removed we found that the it used to vent directly into the attic: there is NO existing chimney!  The new gas fireplace will go in the same location-with a chimney.  At right, a new 8′-4″ door opening looking out to one of the original doors being reused.

Advertisements

Leave a comment

Filed under Pacific Heights House

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s