..pac heights progress..

Things are buzzing along, the crew is staying dry inside while the rain continues.  I did a drive-by today to take some photos and see the tile on the wall…wow.  This glass tile is in the master bathroom – ‘Repose‘ by Waterworks…no grout yet.

The main hallway: We’re using the original picture rail as a guide for establishing the tall door heights. (8′-4″).  Other doors – closets and bathrooms, will be shorter.  The bay window below – not a great place for a fireplace!  -but a good nook for a construction catch-all.  I don’t think the shutters will last the remodel, but there is something interesting about this scene.

A tv niche over the fireplace (the two have become rivals for our attention).  The cove around the fireplace is being patched. 

The slate tile floor is laid but not grouted – it gives the room a sense of geometry.  At right, the stubs for the kitchen island.

Advertisements

Leave a comment

Filed under Pacific Heights House

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s