80s party ends

Although the 1980s have had a rebirth in music and fashion for a few years now, we’re not seeing it back in design.  So the hot tub time machine was ripped out, and now the top floor is down to the studs.   It’s great to be able to actually walk up to this window and look out now. Some wackadoo framing is seen here at a low eave under the dormer: the short verticals under each rafter aren’t nailed into anything!  The space was originally an attic, so that the roof was framed in 2×4 at 32″ o.c.  Looks like someone eavesdropped a soda bottle in there…The image to the right shows a jumble of framing that prevents us from inserting a pocket for the closet door seen there.  We’re happy going with a bi-fold door to avoid a lot of re-roofing outside.  Stairs and the off-center skylight on the left.   We’ll smooth out those textured walls in the bedroom when it’s painted.  Below, a ready-made waterproof niche for the lower bathroom shower from Innovis.

Approaching the zipped-off lower bathroom from the kitchen.

The truck that takes it away – more to come . .

Advertisements

Leave a comment

Filed under master suite

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s