mill valley remodel

These photos are actually a few weeks old, and much has happened since they were taken.  This is the rear side of the house which is being totally remodeled inside and out, including small additions at the front and rear as well.  Note that this end of the house has an offset gable, so part of it is recessed – we’re extending it so it’s a flush wall.  The stairs were formerly enclosed behind a wall.  We widened them, they’ll have an open railing, and the windows will be revised to actually match the spaces.  Below, the stairs are seen from the upper landing. On left, the upper bathroom is being tiled in a 12×12 dark slate color tile.

The family is living camping in the front half of the house, as much as they can, through construction.  The remnant but usable pieces of the kitchen are just inside the plastic wall separating the construction zone.  The new steel beam above allows the rooms at the back to be totally open. Floor plans showing the new areas being added in the shaded hatch.  Large bay windows at the two front bedrooms aren’t hatched but they are new.  More to come!

Advertisements

1 Comment

Filed under Mill Valley Remodel

One response to “mill valley remodel

  1. Brittney

    Question for you. My husband and I are looking at an older home with VERY narrow stairs to the second floor/attic. To use the bedrooms upstairs, we will have to widen the stairs. I am aware of the spacial configuration and extra space it will need, but I have no idea what to expect as far as cost. Can you provide any guidance on cost?

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s