castro corner house

img_0119img_0656

at the castro corner house, the new walls were framed in, and sheetrock is now being installed.

above is the rough framed new stair to the first floor. about 20′ of new concrete retaining wall was poured along the property line. img_9947

in the photo above, part of the concrete wall is thinner to allow for the stair landing in this location – every inch counts to make the stairs work, especially in these narrow san francisco lots! img_0130

here the 6′ tall new concrete is furred out to allow for bathroom plumbing to run inside. img_0356new johns-manville formaldehyde-free insulation (for better indoor air quality) fills the wall cavities where there was no insulation before…..the globe is warming but we’re using more insulation now than we did in 1940. 🙂 img_0664from this point looking over the new stairwell you can see through the lower hallway and to the new garden door. a nice peek to the rear yard without having to go downstairs.. img_0660a view along the floor toward the new built-in bench, and spot where the gas fireplace will go. it’s a corner fireplace by Ortal. pretty slick! can’t wait to see it. we’re further along than these pictures show; some cabinetry is installed, and we’re selecting final finishes now. stay tuned, more to come!

Advertisements

2 Comments

Filed under castro corner house

2 responses to “castro corner house

  1. Hey, that’s our house!

  2. Ted McElroy III

    Great progress!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s