Monthly Archives: November 2017

the cabin bathroom

bathroom makeoverfrom earlier 2017: ah, that 60s-paneling enclosed bathroom – so cozy when you’re doing your thing, smells great when the shower hits it, probably harbors zero germs – butttt, we decided to tear it out and tile the room. plus the floor was soggy and the toilet would tilt when you sat on it. old panelingi appreciate that the grooves align perfectly, and that everything is brown, brown, brown, (it is a bathroom after all). as we know from the previous demo, a wonderful pine ceiling is hidden above the paneling. so down it went. bathroom projectsee? much nicer already, with the ceiling gone. adds good height to the room. Below, we next tackled the floor. A couple layers of linoleum and then the subfloor. The floor framing of this cabin is 4×6 @ 48″ o.c., and the toilet needed some additional new framing below it. we brought in a contractor friend for this ‘heavy lifting’ work.

kohler bellwetherwe slid the new tub – Kohler Bellwether – into place on a piece of carpet, much better than lifting! the cast iron tub weighed 300lbs! and did a good job of weighing down our truck in the snow. we chose this over an acrylic tub because they retain heat better and i read that acrylic can crack – although i’ve never heard of this from any clients. meanwhile, we did find time to break away and hit the slopes at nearby Bear Valley in the continuous epic snowfall: bear valleyit was the most snow in many years and hoping for more this winter! hardie backernow that the tub was in and hardie backerboard installed, time to start prepping for tile install. *disclaimer, this is an informal blog, NOT an instructional story – do not try any of this at home!! we’re not experts! DIY DIY keep reading below for tile fun 🙂  Continue reading

Advertisements

3 Comments

Filed under the cabin