Tag Archives: top floor addition

bay view house

front facadeIs it too late to say happy new year? I say no since this is my first 2016 post. This is a cute 1940s house set on a cul-de-sac, 2 bedroom / 2 bath. Not nearly enough room for a family of now 4 who entertain and occasionally work from home. The program is to add a second floor and push the house out in the rear yard to get more space on the first floor. New total will be 4 bed, 4 bath. view of san franciscoOne really cool thing about its location on a south-facing hill is a surprisingly direct view back to the city across the bay. old stuccoOtherwise it is standard suburban rancho from another era…ready for an update!exposed beamsAt some point the living room was expanded and the ceiling was vaulted with exposed beams – a really nice look that we’re maintaining and improving upon in the new design. kitchen skylightThe kitchen is workable, but feels a little cramped.  A low-ceiling breakfast nook is hidden away in the distance.

In the early stages we studied the possible massing for the top floor addition. 21 BAYVIEW TERR_Front1_14-0401We initially settled on the gable roof with an overhang at the front. BUT: heed my advice, and get a professional lot survey! It was discovered that the house sat within the front yard setback so we had to redesign and push the second floor back. 21 BAYVIEW TERR 2015 balconySilver lining is that they will have a walk-out balcony at the front (the windows have become doors now..) and a circular window to the side gains a city view as well. storypolesStorypoles were installed to demonstrate the extent of the new addition. construction demoDemo happens quickly… The back wall of the house was removed to accommodate the expansion. It almost looks like a stage / bandshell. garden excavationThe rear deck was removed to make way for the addition and pushing the land back a little for a new deck. All this while preserving the persimmon tree in the upper left of the photo!stud framingHere is a photo after concrete and during initial framing from last Fall. The ground floor is mostly framed, and the second floor is just starting. Steel beams are seen on the left, awaiting install, and a narrow Simpson Strong Wall on the left of the house. We’re already far ahead of this phase – stay tuned for more!

Advertisements

1 Comment

Filed under bay view house, Uncategorized

pacific heights part deux update

remodel

Yeah, it’s been a while since I posted on progress! I’ve been running from project to project and have a million photos to upload and share… always be sure to check out the Instagram page for more current blips on construction site day-to-day stuff…but be warned the account is peppered with other random, ‘colorful’, not work-related photography. I’ll leave it at that.

Here we are back at the Pacific Heights House, Part Deux. As of today tile has begun install. Since May the crew has motored through the last bit of framing, through rough plumbing and electric, gyp board and radiant heat install. stair framing

Above is a view up the new stair to the new top floor. Two more views below. new staircase

We’re talking to metal fabricators for a new railing to continue up. We may maintain the existing style or depart from it…victorian remodel victorian mantel

Above are two photos of the front room of the house. We’re adding new shear / plywood to the perimeter walls because of the heavy addition above. In 2009 we didn’t get into these walls much, hence the old plaster & lathe came out and it’s ready for ply now. We’ll match the ‘cove’ ceiling when the wall is replaced. rough plumbing

Walking through, the open walls are a jumble of new plumbing and wiring. Locating switches, outlets, faucet heights, etc. and slight revisions and decisions while we have the chance. It all has to happen before the walls are enclosed with sheetrock.insulation

Insulation is installed. Sheetrock delivered and ready for install.

infinity drain

Above, the crew mocked up what the slope of the shower might be if we rise the core-required full 2″ from the low point of the infinity drain. It seemed a bit steep to stand on sideways so we came up with the idea of dropping the infinity drain downward 1″ so the shower only has to slope 1″ down..sheetrock

Just like that, the sheetrock is up! Windows have arrived are being installed right now as well. We’re using Sierra Pacific to match the windows we used on the floor below in 2009. level 5 smooth

Level 5 smooth….. and a note I made about a thermostat location. toilet room

Above, we’re taping out to see if the swinging door will hit the front edge of the toilet. It looks like it will clear! One person at a time 🙂 radiant heating

Radiant heating “Quik Trak” is being installed next, throughout the new floor level. A less costly alternative to Warmboards and others. In the old project we had to install the tubes from below because we did not want to reduce the ceiling height. quik trak

A corner of the room with the pre-routed grid of the Quik Trak in place. Below, I had a little assistant on the site one day and asked her to take notes during my ‘meeting’, hence the pad & pencil. I could have gotten a better photo! She enjoyed touring the construction site with Uncle Tom and then was down the stairs and ready to go home…but I can’t quit at 2pm! assistant

Stay tuned, more to come! (I will try more frequently!!)

2 Comments

Filed under Pacific Heights House

pacific heights part deux

birds eye view

It’s always a treat to return to a house and start the second phase of a project you designed a master plan for. In this case I worked on an interior to-the-studs remodel of this house back in 2009 – see it here in our portfolio and here on the blog as it was ripped apart. This was a fun collaboration with Ian Stallings Design. Above you see an aerial view of the house as it was recently, with a low pitched roof and attic above the main living space. I was thrilled when the new owners contacted me and expressed that they now want to add the top floor.proposed rendering

We worked off the old plans and made some modifications for the new owners. See renderings of the proposed top floor addition – an elegant, flat roof structure with 2 bedrooms, 2 bathrooms, office space and large outdoor decks that will tie right in with the existing house. The front deck is largest since here in SF you’re encouraged to set back top additions so they’re not competing with the original facade… like it or not!  Below is a view of the rear of the house, with the new intimate master bedroom deck overlooking the existing courtyard space below.

rendering

roof removal

We’re working with Cook Construction for this project – a team we’re very happy with. The demolition of the old roof, its 5 layers of asphalt shingles plus original wood shingles, went pretty swiftly. Above, looking toward the front of the house, below, the rear. old attic

redwood framing

A view from within the front part of the attic looking back – you can see all the recessed lighting, wiring, and ducting from the 2009 project.

top floor addition

Just a short time later, the new floor level was framed in. pacific heights

At the very front of the house, you see the old boards of the cornice / parapet. The views open up in this direction.

framing

Above left – the opening for the new staircase. On the right, the only part of the new roof that is sloped is over the master closet, a result of negotiating with neighbors who were concerned by potential impacts to light. They’ve since moved away. front facade

A little over a week later, the top floor has been mostly framed and plywood is up. This is the front wall. master bedroom

Above is the wall of doors and windows from the master bedroom. new view

Lastly, the beautiful view from the office / hallway area, between two adjacent buildings to the hills beyond. Stay tuned – this one’s moving fast!

1 Comment

Filed under Pacific Heights House